師資陣容:陳子立 老師簡介

164
次閱讀

 

陳 子 立

副教授

學歷國立清華大學工業工程博士
研究專長供應鏈管理、高科技/服務/醫療產業作業管理、應用最佳化與啟發演算法、系統模擬與模擬最佳化、RFID應用與電子商務
服務電話 02-2905-2620
Email082426@mail.fju.edu.tw


期刊論文
  • 陳子立,「A Hybrid Data Mining Approach for Generalizing Characteristics of Emergency Department Visits Causing Overcrowding」,圖書資訊學刊 , (2019-06-01) (TSSCI)
  • 陳子立,「Applying two-phase adaptive genetic algorithm to solve multi-model assembly line balancing problems in TFT–LCD module process」,Journal of Manufacturing Systems , (2019-06-01) (SCI)
  • 陳子立,「Capacity planning with ant colony optimization for TFT-LCD array manufacturing」,Journal of Intelligent Manufacturing 卷, 期 (2018-12-01) :Pages 1695-1713 (SCI)
  • 陳子立,「Multi-Objective Genetic Algorithm for Energy-Efficient Hybrid Flow Shop Scheduling with Lot Streaming」,Annals of Operations Research , (2018-06-23) (SCI)
  • 陳子立,「A Symbolic Time-series Data Mining Framework for Analyzing Load Profiles of Electricity Consumption」,圖書資訊學刊 <第15卷>卷, <第2期>期 (2017-12-01) :頁21-44 (TSSCI)
  • 陳子立,「Comparison of simulated annealing and tabu-search algorithms in advanced planning and scheduling systems for TFT-LCD colour filter fabs」,International Journal of Computer Integrated Manufacturing 卷, 期 (2017-06-01) :516–534 (SCI)
  • 陳子立,「Stochastic resource allocation in emergency departments with a multi-objective simulation optimization algorithm」,Health care management science 卷, 期 (2017-03-01) :Pages 55-75 (SSCI)
  • 陳子立,「A particle swarm approach for optimizing a multi-stage closed loop supply chain for the solar cell industry」,Robotics and Computer-Integrated Manufacturing 卷, <無>期 (2017-02-01) :Pages 111–123 (SCI)
  • 陳子立,「Capacity planning for packaging industry」,Journal of Manufacturing Systems <ˋ42卷>卷, <無>期 (2017-01-01) :Pages 153–169 (SCI)
  • 陳子立,「An Empirical Study on Mining Behaviors of Patients Based on Their Length of Stay in the Emergency Department」,管理與系統 <23卷>卷, <4期>期 (2016-10-01) :527 - 561 (TSSCI)
  • 陳子立,「Capacity planning in thin film transistor – Liquid crystal display cell process」,Journal of Manufacturing Systems 卷, 期 (2016-04-01) :Pages 63–78 (SCI)
  • 陳子立,「Multi-objective simulation optimization for medical capacity allocation in emergency department」,Journal of Simulation 卷, 期 (2016-02-01) :pp. 50-68 (SCI)
  • 陳子立,「Capacity planning for integrated circuit final test plants」,International Journal of Computer Integrated Manufacturing , (2015-12-01) (SCI)
  • 陳子立,「Using a hybrid approach based on the particle swarm optimization and ant colony optimization to solve a joint order batching and picker routing problem」,International Journal of Production Economics 卷, 期 (2015-12-01) :pages 805–814 (SCI)
  • 陳子立,「Capacity planning for integrated circuit final test plants」,International Journal of Computer Integrated Manufacturing 卷, 期 (2015-12-01) :pages 1262-1274 (SCI)
  • 陳子立,「An efficient hybrid algorithm for integrated order batching, sequencing and routing problem」,International Journal of Production Economics , (2015-01-01) (SCI)
  • Li-Chih Wang、Yin-Yann Chen、Tzu-Li Chen、Chen-Yang Cheng、Chin-Wei Chang,「A Hybrid Flowshop Scheduling Model Considering Dedicated Machines and Lot-splitting for the Solar Cell Industry」,International Journal of Systems Science 卷, 期 (2014-10-01) :pp. 2055–2071 (SCI)
  • 陳子立,「Transferring cognitive apprenticeship to manufacturing process knowledge management system: a case study of small and medium-sized coating industry」,VINE 卷, 期 (2014-07-01) :pp. 420-444 (其他)
  • 陳子立,「An analysis of the structural complexity of supply chain networks」,Applied Mathematical Modelling 卷, 期 (2014-05-01) :pages 2328–2344 (SCI)
  • 陳子立,「A Stochastic Dynamic Programming Approach for Multi-Site Capacity Planning in TFT-LCD Manufacturing under Demand Uncertainty」,International Journal of Production Economics 卷, (2014-02-01) :pp. 21-36 (SCI)
  • I-Chin Wu、Ruei-Jie Li、Tzu-Li Chen,「以資料探勘技術建立宅配業之車輛維修及預警決策支援系統」,管理與系統 , (2014-01-01) (TSSCI)
  • Tzu-Li Chen、James T. Lin、Cheng-Hung Wu,「Coordinated Capacity Planning in Two-stage Thin-Film-Transistor Liquid-Crystal-Display (TFT-LCD) Production Networks」,OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE 卷, 期 (2014-01-01) :141-156 (SCI)
  • Tzu-Li Chen、Yin-Yann Chen、Hao-Chun Lu,「A capacity allocation and expansion problem for TFT-LCD multi-site manufacturing」,Journal of Intelligent Manufacturing 卷, 期 (2013-08-01) :847-872 (SCI)
  • Chen-Yang Cheng、Tzu-Li Chen、Li-Chih Wang、Yin-Yann Chen,「A Genetic Algorithm for Multi-Stage and Parallel-Machine Scheduling Problems – A Case Study for Solar Cell Industry」,International Journal of Production Research 卷, 期 (2013-08-01) :4755-4777 (SCI)
  • Yin-Yann Chen、Tzu-Li Chen、Cheng-Dar Liou,「Medium-term Multi-plant Capacity Planning Problems Considering Auxiliary Tools for the Semiconductor Foundry」,International Journal of Advanced Manufacturing Technology 卷, (2013-05-01) :1213-1230 (SCI)
  • Hao-Chun Lu、Tzu-Li Chen,「Efficient Model for Interval Goal Programming with Arbitrary Penalty Function」,Optimization Letters 卷, 期 (2013-02-01) :325-341 (SCI)
  • Yin-Yann Chen、Chen-Yang Cheng、Li-Chih Wang、Tzu-Li Chen,「A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems- a case study for solar cell industry」,International Journal of Production Economics 卷, 期 (2013-01-01) :66–78 (SCI)
  • Tzu-Li Chen、Hao-Chun Lu,「Stochastic Multi-Site Capacity Planning of TFT-LCD Manufacturing Using Expected Shadow-Price Based Decomposition」,Applied Mathematical Modelling 卷, 期 (2012-12-01) :5901–5919 (SCI)
  • Yin-Yann Chen、James T. Lin、Tzu-Li Chen,「A Two-Phase Dynamic Dispatching Approach for Semiconductor Wafer Test」,Robotics and Computer-Integrated Manufacturing 卷, (2011-10-01) :889-901 (SCI)
  • James T. Lin、Cheng-Hung Wu、Tzu-Li Chen、Shin-Hui Shih,「A Stochastic Programming Model for Strategic Capacity Planning in Thin Film Transistor – Liquid Crystal Display (TFT-LCD) Industry」,Computers & Operations Research 卷, (2011-06-01) :992-1007 (SCI)
  • James T. Lin、Tzu-Li Chen,「A Hierarchical Planning and Scheduling Framework for TFT-LCD Production Chain」,Automation Quarterly , (2010-09-01) (其他)
  • Tzu-Li Chen、James T. Lin、Shu-Cherng Fang,「A Shadow-Price Based Heuristic for Capacity Planning of TFT-LCD Manufacturing」,Journal of Industrial and Management Optimization 卷, 期 (2010-02-01) :209-239 (SCI)
  • James T. Lin、Tzu-Li Chen、Yen-Ting Lin,「Critical Material Planning for TFT-LCD Production Industry」,International Journal of Production Economics 卷, (2009-09-01) :639-655 (SCI)
  • James T. Lin、Chien-Chi Tsai、Yin-Yann Chen、Tzu-Li Chen,「Dispatching Rules with Queue-Time-Limit Consideration for Furnace in Wafer Fabrication Factory」,Journal of Advanced Engineering 卷, 期 (2009-07-01) :273-278 (其他)
  • James T. Lin、Tzu-Li Chen、Wei-June Chen,「Capacity and product mix planning problem for TFT Array multi-plant」,Journal of the Chinese Institute of Industrial Engineers 卷, 期 (2007-09-01) :489-504 (TSSCI、EI)
  • James T. Lin、Tzu-Li Chen、Tiffany Tsai、Jeffery J. Lai、Tuo-Chung Huang,「A SCOR-Based Methodology for Analyzing and Designing Supply Chain」,International Journal of Electronic Business Management 卷, 期 (2005-03-01) :1-7 (EI)
  • James T. Lin、Tzu-Li Chen、Chien-Chung Huang,「A Hierarchy Planning Model for TFT-LCD Production Chain」,International Journal of Electronic Business Management 卷, 期 (2004-02-01) :59-68 (EI)
  • Chien-Chung Huang、Tzu-Li Chen、Gau-Rong Liang,「Build up the Decision Support System for Production Line」,Journal of the Mechatronic Industry 卷, 期 (2000-01-01) (其他)

 

學術會議論文
  • Tzu-Li Chen、James T. Lin、Su-Jung Wu,「Approximate Dynamic Programming for Stochastic Capacity Planning in TFT-LCD Industry」, The 8th International Congress on Logistics and SCM Systems, Tokyo,Japan, 2013-08-05
  • Li-Chih Wang、Tzu-Li Chen、Yin-Yann Chen、Hsin-Yuan Miao、Sheng-Chieh Lin、Shuo-Tsung Chen,「Genetic Algorithm Approach for Multi-objective Optimization of Closed-loop Supply Chain Network」, IIE Asian Conference 2013, Taipei, Taiwan, 2013-07-18
  • Li-Chih Wang、Tzu-Li Chen、Yin-Yann Chen、Yi-Wen Chen、Allen Wang,「Closed-Loop Sustainable Supply Chain Design under Uncertainties」, 23rd International Conference on Flexible Automation and Intelligent Manufacturing, Porto, Portugal, 2013-06-01
  • Li-Chih Wang、Chen-Yang Cheng、Tzu-Li Chen、Yin-Yann Chen、Chung-Chun Wang,「A Multi-Stage and Parallel-Machine Scheduling Problem for Solar Cell Industry」, The 3rd International Asia Conference on Industrial Engineering and Management Innovation,, Beijing, China, 2012-08-10 ~2012-08-11
  • Tzu-Li Chen、Hao-Chun Lu,「Stochastic Capacity Planning of TFT-LCD Manufacturing under Demand Uncertainty」, 1st International Conference of Supply Chain & Operations Management, Seoul, South Korea, 2012-08-08 ~2012-08-10
  • Li-Chih Wang、Chen-Yang Cheng、Yin-Yann Chen、Tzu-Li Chen,「An Integrated Algorithm for Solar Cell Parallel Machine Scheduling Problems」, 22nd International Conference on Flexible Automation and Intelligent Manufacturing, Helsinki, Finland, 2012-06-10 ~2012-06-13
  • Yin-Yann Chen、Tzu-Li Chen、Wei-Ling Chen,「The Capacity Allocation Planning and Expansion Policy Problems Considering Auxiliary Tools」, 2011 International Conference on System Science and Engineering, Macau, China, 2011-12-15
  • James T. Lin、Tzu-Li Chen,「A Stochastic Dynamic Programming Model for Multi-Site Capacity Planning in TFT-LCD industry」, IEEE The 18th International Conference on Industrial Engineering and Engineering Management, ChangChun, China, 2011-10-01
  • Hao-Chun Lu、Tzu-Li Chen,「Efficient Interval Goal Programming for Arbitrary Penalty Function」,Technology Innovation and Industrial Management 2011, Oulu, Finland, 2011-07-01
  • James T. Lin、Tzu-Li Chen、Yin-Yann Chen,「Medium-term Multi-plant Capacity Planning Problems for Semiconductor Foundry」, IEEE The 17th International Conference on Industrial Engineering and Engineering Management, Xiamen, China, 2010-10-11
  • James T. Lin、Tzu-Li Chen,「A Hierarchical Planning in TFT-LCD Industry: Framework and Review」, The 2010 International Conference on Innovation and Management, Malaysia, Malaysia, 2010-07-06
  • James T. Lin、I-Hsuan Hong、Tzu-Li Chen、Kai-Sheng Wang,「A multi-site available-to-promise model for TFT-LCD manufacturing」, The 10th Asia Pacific Industrial Engineering & Management System (APIEMS 2009), Kitakyushu, Japan, 2009-11-01
  • James T. Lin、Tzu-Li Chen、Hsiao-Ching Chu、Chung-Han Yang,「A Capacity Planning Model for TFT-LCD Production Networks」, IEEE The 16th International Conference on Industrial Engineering and Engineering Management (IE&EM’2009), Beijing, China, 2009-10-20
  • 林則孟、周俐君、陳子立、陳盈彥,「晶圓代工廠多廠區之中期產能規劃問題」, 九十七年度中國工業工程學會年會, 中壢, 臺灣, 2008-12-20
  • 林則孟、蔡建基、陳盈彥、陳子立,「考量等候時間限制之半導體爐管機台派工法則」, 九十七年度中國工業工程學會年會, 中壢, 臺灣, 2008-12-20
  • 陳子立、林則孟,「需求不確定下之TFT-LCD多廠區隨機產能規劃模式」, 九十七年度中國工業工程學會年會, 中壢, 臺灣, 2008-12-20
  • James T. Lin、Tzu-Li Chen、Hsiao-Ching Chu,「Capacity Allocation and Expansion for Multi-Generation & Multi-Site TFT-LCD Manufacturing」, 2008 International Conference of Production and Operation Management, Xiamen, China, 2008-10-01
  • James T. Lin、Cheng-Hung Wu、Tzu-Li Chen、Yi -Ching Chang,「A Stochastic Programming Model for Strategic Capacity Planning in TFT-LCD Production Chain」, The 8th Asia Pacific Industrial Engineering & Management System (APIEMS 2007), Kaohsiung, Taiwan, 2007-12-09
  • James T. Lin、Tzu-Li Chen,「A Capacity Planning Model in the TFT-LCD Production Chain」, 2007 IEEE/INFORMS International Conference on Service Operations and Logistics, and Informatics (SOLI),Philadelphia, USA, 2007-08-15
  • 林則孟、陳子立、陳韋均,「TFT Array多廠區之產能與產品組合規劃問題」, 九十五年度中國工業工程學會年會, 台中, 臺灣, 2006-11-23
  • James T. Lin、Tzu-Li Chen、Yen-Ting Lin,「A Hierarchical Planning and Scheduling Framework for TFT-LCD Production Chain」, The 2006 IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI), Bejing, China, 2006-07-10
  • 林則孟、陳子立、李東岳、張翔壹,「SCOR為基全球供應鏈營運模式分析—以紡織業為例」, 2006年產業電子化運籌管理學術暨實務研討會, 宜蘭, 臺灣, 2006-05-01
  • 林則孟、劉家佑、胡凱晏、陳子立,「多階層電子標籤供應鏈之EPC Network運作模式探討」, 2006自動化科技研討會, 彰化, 臺灣, 2006-05-01
  • James T. Lin、Chien-Ming Chen、Tzu-Li Chen,「Supply Chain Operation Model and E-Commerce Applications: A Case Study of Assembly and Testing House」, The Eighth International Conference on Automation Technology Conference, Taichung, Taiwan, 2005-07-15
  • 林則孟、陳子立、賴俊翰,「以SCOR為基供應鏈作業之分析與設計—以TFT-LCD產業為例」, 九十三年度中國工業工程學會年會論文, 台南, 臺灣, 2004-11-15
  • 林則孟、陳子立、陳建銘、賴俊翰,「半導體專業分工供應鏈運作模式分析-以封裝測試廠為例」, 2004 第十三屆全國自動化科技研討會, 台北, 臺灣, 2004-06-01
  • 林則孟、陳子立、蔡佳君、賴俊翰、黃拓中,「以SCOR為基之供應鏈分析與設計方法論」, 2004年產學合作產業電子化研討會, 台北, 臺灣, 2004-06-01
  • James T. Lin、Wu-Der Jeng、Tzu-Li Chen,「A BTO Strategy based Scheduling in TFT-LCM Manufacturing」, Proceedings of the 33rd International Conference on Computers and Industrial Engineering, Jeju, Korea, 2004-03-25 ~2004-03-27
  • 林則孟、陳子立、黃建中、鄭武德,「以限制為基礎之模擬法應用在多重限制生產鏈規劃」, 九十二年度中國工業工程學會年會, 彰化, 臺灣, 2003-11-01
  • 林則孟、黃建中、陳子立、陳盈彥,「TFT-LCD多廠區生產鏈之生產規劃架構」, 2003年產業電子化運籌管理學術暨實務研討會, 台中, 臺灣, 2003-06-01

 

科技部研究計畫
  • 陳子立,「急診室醫療資源規劃與排程之研究」, 2018-08-01~2019-07-31 ,106-2221-E-030-009-MY3
  • 陳子立,「急診室醫療資源規劃與排程之研究」, 2017-08-01~2018-07-31 ,106-2221-E-030-009-MY3
  • 陳子立,「不確定環境下之隨機物料採購規劃」, 2016-08-01~2017-07-31 ,104-2221-E-030-011-MY2
  • 陳子立,「考慮碳市場交易與不確定性之封閉性永續供應鏈網路設計(I)」, 2014-08-01~2015-07-31 ,103-2221-E-030-022-
  • 陳子立,「考慮風險趨避多目標隨機產能規劃之研究」, 2013-08-01~2014-07-31 ,NSC102-2221-E-030-016
  • 陳子立,「應用多目標模擬最佳化求解隨機急診醫療資源配置問題(I)」, 2012-08-01~2013-10-30 ,NSC 101-2221-E-030 -014
  • 馮嚴毅、陳子立,「整合資料探勘與系統模擬技術之急診室病患追蹤與決策支援系統(I)」, 2012-08-01~2013-07-31 ,NSC101-2221-E-195-001
  • 陳子立,「TFT-LCD 產業隨機動態產能規劃--模型與解法(I)」, 2011-08-01~2012-10-31 ,NSC100-2221-E-030 -007
  • 陳子立,「TFT-LCD 生產鏈產能規劃問題之探討(I)」, 2010-11-01~2011-10-31 ,NSC 99-2218-E-030 -001

 

非科技部研究計畫
  • 陳子立,「造紙業能源使用分析技術」, 財團法人工業技術研究院, 2016-03-15~2016-11-15
  • 陳子立,「SQL Server 與 HBase資料整合之視覺化報表系統」, 財團法人工業技術研究院, 2015-09-01~2015-11-15
  • 陳子立,「自動化工作流程與搬運流程改善與分析」, 財團法人工業技術研究院, 2014-09-01~2014-11-30
  • 陳子立,「工藝產業生產管理人才職能之研究」, 財團法人工業技術研究院, 2013-09-16~2014-03-31
  • 陳子立,「對急診壅塞與阻礙之關鍵路徑分析: 離散事件模擬與即時追蹤系統建置」, 馬偕紀念醫院, 2011-01-01~2011-12-31

 

獲獎紀錄

 

學術資料查詢 ▶